NJDOT is scheduled to perform “High Priority Structural Repairs” to the (Main Street) Queens Bridge (CR 527) over the D&R Canal in South Bound Brook on or about September 8, 2017. The repairs will take approximately two months and will require the full closure of the bridge.
The pedestrian walkway will be open during construction and allow for safe passage for pedestrians walking across the bridge.